Exklusiver Live-Stream direkt von der World of Trading - 2 Tage mit einzigartigen Themen und Experten. Kostenlos teilnehmen + Videos erhalten. -w-
18.08.2021 13:00:00

SSR Mining Announces Positive Exploration Results for the Çakmaktepe Extension Project ("Ardich"), Including 40.7 Meters at 7.48 g/t Au

Results Reaffirm Mineral Resource Growth Potential
Maiden Mineral Reserve Expected 2022, First Production Expected in 2023

DENVER, Aug. 18, 2021 /CNW/ - SSR Mining Inc. (NASDAQ: SSRM) (TSX: SSRM) (ASX: SSR) ("SSR Mining") is pleased to announce positive results from 194 diamond drill holes for Ardich for the period from March 2020 to May 2021. These results build upon the preliminary economic analysis ("PEA") reported in the Çöpler District Master Plan ("CDMP20") Technical Report issued in November 2020, in which the Ardich deposit contributed 1.23 million ounces of gold from Measured and Indicated resources, and 0.35 million ounces of gold from Inferred Mineral Resources, providing an after tax NPV5% of US$431M1.

Ardich represents a key organic growth initiative for SSR Mining, with the PEA highlighting the potential for approximately 1.1 million ounces of gold production over an 11-year mine life for approximately $50 million in development capital expenditures1. Ardich was discovered in 2017 and is located 1.5km north of the Çakmaktepe mine and 6km from the Çöpler operations, allowing future development to leverage existing oxide and sulfide processing infrastructure (Figure 1). Drilling and technical study activities are ongoing to further refine the value of this near mine opportunity and target a maiden Mineral Reserve declaration in 2022. Permitting is concurrently being advanced with a target for first gold production in 2023.

All 194 diamond holes (AR234-AR427) reported in this release were drilled in 2020 and 2021 subsequent to the cut-off date used in the compilation of the Mineral Resources in the PEA. None of the assays reported in today's release were included in the CDMP20. These new results include both step-out holes (drilled outside of and below the current Mineral Resource) (Table 1) and in-fill (within the area of the current Mineral Resource) (Table 2). The step-out holes are located to the west, south and south-west of the current Ardich Mineral Resource area. Step-out holes confirmed the extension of mineralization (Figure 2) (Table 1), many with impressive grades, including the following holes:

  • AR274: 7.48 g/t Au over 40.7 meters from 155 meters, including 29.99 g/t Au over 5 meters from 187 meters.
  • AR280: 4.18 g/t Au over 24.5 meters from 246 meters, including 35.1 g/t Au over 1 meter from 264 meters.
  • AR356: 2.98 g/t Au over 62.7 meters from 163 meters, including 13.43 g/t Au over 3.4 meters from 205 meters.
  • AR407: 3.68 g/t Au over 54 meters from 145 meters, including 15.43 g/t Au over 2 meters from 157 meters.
  • AR417: 2.20 g/t Au over 49.8 meters from surface.

Rod Antal, President and CEO said, "These are great results and we are eager to build them into our models as we aim to both improve on the Ardich PEA case presented in the current Technical Report and deliver an initial Mineral Reserve statement for the project. Permitting and other works required to bring Ardich into production continue in parallel with the exploration and resource definition drilling. We continue to view Ardich as a key driver of organic growth in our global exploration portfolio, with first production expected in 2023."

Figure 1: Location map of the Ardich Gold Project. The haul road constructed for the Çakmaktepe oxide ore is 1.5km to Ardich. (CNW Group/SSR Mining Inc.)

The PEA case is preliminary in nature and includes an economic analysis that is based, in part, on Inferred Mineral Resources. Inferred Mineral Resources are considered too speculative geologically for the application of economic considerations that would allow them to be categorized as Mineral Reserves, and there is no certainty that the results will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

Overview of Mineralization Style

The Ardich deposit is a listwanite-dolomite hosted gold replacement mineralization occurring along thrust fault zones between listwanite, ophiolite, dolomite, cataclastite, hornfels, and limestone. Mineralization and alteration extend in a NW-SE direction, parallel to major high angle fault structures controlling both mineralization and block rotations. Gold grades increase at dolomite-listwanite contacts and within silica-rich (jasperoid) listwanites. The mineralization is predominantly oxide with sulfide mineralization confined to pyrite-rich jasperoid zones. Based on available drill data, the main mineralized zone appears tabular and almost flat lying.

As exploration advances and the geological understanding of the Çakmaktepe and Ardich deposits increases, it appears that there is probable structural connectivity between the areas, potentially creating an expanded "Greater Çakmaktepe" development pathway.

Figure 2: Drill hole locations and surface outline of PEA case pit. Note: Step-Out holes within the PEA boundary indicate mineralization below the PEA pit shell. (CNW Group/SSR Mining Inc.)

Figure 3: Section showcasing highlight step-out intercepts below the PEA case pit. (CNW Group/SSR Mining Inc.)

Drilling

SSR Mining has drilled 427 diamond core holes at Ardich between August 2017 and June 2021, totaling 86,898m. The majority of these drill holes were drilled within SSR's 80% owned and managed licenses and greater than approximately 96 % of Ardich Mineral Resources are located on ground held 80% by SSR Mining, with the remainder located on ground 50% held by SSR Mining.2

The 194 holes in this release total 43,627m of drilling that was completed between March 2020 - May 2021 (AR234-AR427). These additional holes improve definition of the west, south and south-eastern extensions of gold mineralization defined by the earlier programs. The main Ardich mineralization dips gently towards the southeast and is interpreted to become deeper due to faulting and topography. SSR Mining currently has seven diamond drill rigs active at Ardich.

Drill Highlights

Table 1: Best 10 Step-out drill holes with significant gold intercepts at the Ardich project.

Hole ID

From
(m)

To
(m)

Interval
(m)

Au
(g/t)

Oxidation
State

EOH
Depth
(m)

Comments

AR274

154.80

195.50

40.70

7.48

Sulfide

281.0


Including

179.50

181.50

2.00

14.63

Sulfide


Including

186.50

191.50

5.00

29.99

Sulfide


AR279

152.20

203.00

50.8

4.02

Mixed

290.0

50/50 Oxide/Sulfide, 4 m at 0.25 g/t Au from 192 m included in the mineralized interval

Including

170.00

172.00

2.0

12.88

Sulfide


Including

183.00

185.00

2.0

14.78

Sulfide


AR280

246.00

270.50

24.5

4.18

Mixed

308.0

88/12 Oxide/Sulfide, includes 0.7 m isolated core loss

Including

264.00

265.00

1.0

35.10

Sulfide


AR327

172.50

210.60

38.10

6.38

Sulfide

210.6

172.5 - 175.5 m and 208.4 - 210.6 m Sulfide, includes 0.3 m isolated core loss

Including

185.50

186.50

1.00

14.00

Sulfide


Including

192.50

193.50

1.00

16.05

Sulfide


Including

200.50

201.50

1.00

13.80

Sulfide


Including

204.50

205.50

1.00

13.50

Sulfide


Including

206.30

207.10

0.80

11.05

Sulfide


AR356

163.00

225.70

62.70

2.98

Mixed

248.3

57/43 Oxide/Sulfide, includes 0.8 m isolated core loss

Including

200.20

201.20

1.00

14.45

Oxide


Including

203.30

204.30

1.00

11.85

Oxide


Including

205.30

208.70

3.40

13.43

Oxide

Includes 0.4 m isolated core loss

Including

212.70

213.70

1.00

12.55

Oxide


AR357

202.60

224.50

21.90

7.15

Sulfide

269.8

202.6 - 203.8 m and 221.5 - 222.5 m Oxide

Including

208.00

209.00

1.00

15.00

Sulfide


Including

210.00

211.00

1.00

11.10

Sulfide


Including

212.00

215.00

3.00

14.58

Sulfide


Including

215.70

217.00

1.30

14.70

Sulfide


AR361

173.50

199.30

25.80

6.83

Mixed

217.5

61/39 Oxide/Sulfide

Including

181.50

182.50

1.00

11.15

Sulfide


Including

188.50

189.50

1.00

10.80

Oxide


Including

192.50

193.50

1.00

11.05

Oxide


Including

194.50

195.30

0.80

11.95

Oxide


AR393

29.30

46.30

17.00

1.26

Oxide

266.2

34.3 - 35.3 m Sulfide

77.50

80.80

3.30

0.68

Oxide


117.00

148.60

31.60

4.04

Mixed

44/56 Oxide/Sulfide, includes 0.4 m isolated core loss

Including

125.00

128.00

3.00

16.35

Sulfide


Including

131.00

132.00

1.00

10.95

Sulfide



202.40

206.40

4.00

0.50

Sulfide


220.20

223.20

3.00

0.46

Mixed

33/67 Oxide/Sulfide

AR407

87.10

90.70

3.60

0.40

Oxide

251.3


144.60

198.60

54.00

3.68

Oxide

65/35 Oxide/Sulfide, includes 2.5 m isolated core loss

Including

154.10

155.10

1.00

16.85

Oxide

33/67 Oxide/Sulfide

Including

157.10

159.10

2.00

15.43

Oxide

33/67 Oxide/Sulfide

Including

168.60

169.60

1.00

12.60

Sulfide

67/33 Oxide/Sulfide


216.70

222.70

6.00

1.34

Oxide

220.7 - 221.7 m Sulfide

230.70

234.50

3.80

0.32

Oxide


AR417

0.00

49.80

49.80

2.20

Oxide

125.0


112.50

117.50

5.00

1.01

Oxide



Significant gold intervals reported at a nominal 0.3 g/t gold cut-off and with a maximum 2.5m contiguous dilution are given in Table 1. All thicknesses are down hole length and true widths are not known at this stage.

Table 2: Best 10 In-Fill drill holes with significant gold intercepts at the Ardich Project.

Hole ID

From
(m)

To
(m)

Interval
(m)

Au
(g/t)

Oxidation
State

EOH
Depth
(m)

Comments

AR246

152.00

188.00

36.00

5.78

Sulfide

317.0

152.0 - 154.7 m Oxide

Including

169.00

172.00

3.00

13.68

Sulfide


Including

177.00

178.00

1.00

11.95

Sulfide


Including

181.40

184.40

3.00

15.10

Sulfide


AR248

149.00

194.60

45.60

3.09

Oxide

260.2

Isolated 4 m core loss.

Including

168.50

172.90

4.40

11.45

Oxide

Isolated 0.6 m core loss.

AR300

121.00

157.90

36.90

2.60

Mixed

197.0

75/25 Sulfide Oxide, includes 0.5 m isolated core loss

Including

138.60

139.60

1.00

11.05

Sulfide

33/67 Sulfide/Oxide

AR304

146.00

162.00

16.00

8.30

Mixed

241.7

38/62 Sulfide/Oxide

Including

148.00

149.00

1.00

11.40

Oxide


Including

151.00

157.00

6.00

16.68

Sulfide

154.0 - 155.0m Oxide


165.00

181.00

16.00

0.60

Oxide


AR379

96.20

157.00

60.80

3.83

Oxide

254.1

116.7 - 117.7 m, 137.5 - 142.50m and 144.5 - 145.5m Sulfide

Including

102.20

103.20

1.00

15.10

Oxide



161.00

190.00

29.00

1.85

Mixed

84/16 Oxide/Sulfide


193.00

220.00

27.00

1.00

Oxide


AR381

45.00

71.60

26.60

2.90

Oxide

155.0

68.6 - 71.6 m Sulfide

Including

49.00

50.00

1.00

14.35

Oxide



119.60

122.60

3.00

0.54

Oxide


AR387

121.10

141.50

20.40

4.15

Oxide

192.7



164.90

168.10

3.20

0.55

Sulfide


AR390

156.50

188.80

32.30

3.56

Mixed

239.9

62/38 Oxide/Sulfide

Including

163.30

164.30

1.00

13.10

Sulfide

169.0 - 169.8 m Oxide

Including

169.00

169.80

0.80

10.35

Oxide


AR404

4.00

53.70

49.70

1.67

Oxide

114.4

4.0 - 5.0 m, 28.0 - 29.0 m and 35.0 - 36.6 m Sulfide


57.70

67.00

9.30

0.43

Oxide

65.00 - 67.00m Sulfide

AR406

60.40

120.20

59.80

1.38

Oxide

181.0

111.0 - 111.8 m Sulfide, includes 0.8 m isolated core loss


133.00

137.00

4.00

0.30

Sulfide



153.00

160.00

7.00

1.16

Mixed

43/57 Oxide/Sulfide


Significant gold intervals reported at a nominal 0.3 g/t gold cut-off and with a maximum 2.5m contiguous dilution are given in Table 2. All thicknesses are down hole length and true widths are not known at this stage.

The complete drill assay results and further technical information relating to this news release can be found below.

Technical Procedural Information

Sampling, Assaying and QA/QC

The Ardich drilling program started in 2017. Diamond drill core is sampled as half core at 1m intervals or geological contacts. Sampling interval varies between 0.4 meters and 3.2 meters with an average of 1.24 meters length. The samples were submitted to ALS Global laboratories in Izmir, Turkey for sample preparation and analysis which is of an ISO/IEC 7025:2005 certified and accredited laboratory. Bureau Veritas (Acme) laboratory, Ankara was used for umpire check sample analysis. Gold was analyzed by fire assay with an AAS finish, and the multi-element analyses were determined by four acid digestion and ICP-AES and MS finish. For gold assays greater than or equal to 10 g/t, the fire assay process is repeated with a gravimetric finish for coarse gold. The drill and geochemical samples were collected in accordance with accepted industry standards. SSR Mining conducts routine QA/QC analysis on all assay results, including the systematic utilization of certified reference materials, blanks, field duplicates, and umpire laboratory check assays. External review of data and processes relating to Ardich has been completed by independent consultant Dr. Erdem Yetkin, P.Geo. in July 2021. There were no adverse material results detected and the QA/QC indicates the information collected is acceptable, and the database can be used for further studies.

Metallurgical Test Work

Metallurgical test work and recovery assumptions are reported in CDMP20 and include heap leach for oxide ores and flotation and pressure oxidation of sulfide ore.

Qualified Person

The exploration results disclosed in this document were prepared under the supervision and approved by Dr. Cengiz Y. Demirci, AIPG Registered Member and a CPG (Certified Professional Geologist), and VP Exploration at SSR Mining. Dr. Demirci has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and is a qualified person pursuant to National Instrument 43-101 ("NI 43-101").

External review of data and processes relating to the Ardich was completed in July 2021 by independent consultant Dr. Erdem Yetkin, P.Geo. a qualified person as defined by NI 43-101. There were no adverse material results detected and Dr. Yetkin is of the opinion that the QA/QC indicates the information collected is acceptable, and the database can be used for announcing the exploration results.

End Notes

  • The PEA Case is preliminary in nature and includes an economic analysis that is based, in part, on Inferred Mineral Resources. Inferred Mineral Resources are considered too speculative geologically for the application of economic considerations that would allow them to be categorized as Mineral Reserves, and there is no certainty that the results will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

  • The Çöpler gold mine is owned and operated by Anagold Madencilik Sanayi ve Ticaret Anonim Şirketi (Anagold). SSR Mining controls 80% of the shares of Anagold, Lidya Madencilik Sanayi ve Ticaret A.Ş. ("Lidya"), controls 18.5%, and a bank wholly owned by Çalık Holdings A.Ş., holds the remaining 1.5%. Exploration tenures surrounding the project area and mining at Çakmaktepe are subject to joint venture agreements between SSR Mining and Lidya that have varying interest proportions. SSR Mining controls 50% of the shares of Kartaltepe Madencilik Sanayi ve Ticaret Anonim Şirketi and 50% of Tunçpinar Madencilik Sanayi ve Ticaret Anonim Şirketi. The other 50% is controlled by Lidya. Greater than 96% of the Mineral Resource is located on SSR Mining owned 80% ground, with the remainder of the mineralization within the 50/50% ownership boundary.
  • About SSR Mining

    SSR Mining Inc. is a leading, free cash flow focused intermediate gold company with four producing assets located in the USA, Turkey, Canada, and Argentina, combined with a global pipeline of high-quality development and exploration assets in the USA, Turkey, Mexico, Peru, and Canada. In 2020, the four operating assets produced approximately 711,000 gold-equivalent ounces. SSR Mining is listed under the ticker symbol SSRM on the NASDAQ and the TSX, and SSR on the ASX.

    SSR Mining Contacts

    F. Edward Farid, Executive Vice President, Chief Corporate Development Officer
    Alex Hunchak, Director, Corporate Development and Investor Relations

    SSR Mining Inc.
    E-Mail: invest@ssrmining.com
    Phone: +1 (416) 306-5789

    To receive SSR Mining's news releases by e-mail, please register using the SSR Mining website at www.ssrmining.com.

    Cautionary Note Regarding Forward-Looking Information

    Except for statements of historical fact relating to the Company, certain statements contained in this press release constitute forward-looking information, future oriented financial information, or financial outlooks (collectively "forward-looking information") within the meaning of Canadian securities laws. Forward-looking information may be contained in this document and the Company's other public filings. Forward-looking information relates to statements concerning the Company's outlook and anticipated events or results and in some cases, can be identified by terminology such as "may", "will", "could", "should", "expect", "plan", "anticipate", "believe", "intend", "estimate", "projects", "predict", "potential", "continue" or other similar expressions concerning matters that are not historical facts.

    Forward-looking information in this press release is based on certain key expectations and assumptions made by the Company. Although the Company believes that the expectations and assumptions on which such forward-looking information is based are reasonable, undue reliance should not be placed on the forward-looking information because the Company can give no assurance that they will prove to be correct. Forward-looking information is subject to various risks and uncertainties which could cause actual results and experience to differ materially from the anticipated results or expectations expressed in this press release. The key risks and uncertainties include, but are not limited to: local and global political and economic conditions; governmental and regulatory requirements and actions by governmental authorities, including changes in government policy, government ownership requirements, changes in environmental, tax and other laws or regulations and the interpretation thereof; developments with respect to COVID-19 pandemic, including the duration, severity and scope of the pandemic and potential impacts on mining operations; and other risk factors detailed from time to time in the Company's reports filed with the Canadian securities regulatory authorities.

    Forward-looking information in this press release include statements concerning, among other things: forecasts; outlook; timing of production; production, cost, operating and capital expenditure guidance; the Company's intention to return excess attributable free cash flow to shareholders; the timing and implementation of the Company's dividend policy; the implementation of any share buyback program and the amount thereof; statements regarding plans or expectations for the declaration of future dividends and the amount thereof; future cash costs and all in sustaining costs ("AISC") per ounce of gold, silver and other metals sold; the prices of gold, silver and other metals; Mineral Resources, Mineral Reserves, realization of Mineral Reserves, and the existence or realization of Mineral Resource estimates; the Company's ability to discover new areas of mineralization; the timing and extent of capital investment at the Company's operations; the timing and extent of capitalized stripping at the Company's operations; the timing of production and production levels and the results of the Company's exploration and development programs; current financial resources being sufficient to carry out plans, commitments and business requirements for the next twelve months; movements in commodity prices not impacting the value of any financial instruments; estimated production rates for gold, silver and other metals produced by the Company; the estimated cost of sustaining capital; availability of sufficient financing; receipt of regulatory approvals; the timing of studies, announcements, and analysis; the timing of construction and development of proposed mines and process facilities; ongoing or future development plans and capital replacement; estimates of expected or anticipated economic returns from the Company's mining projects, including future sales of metals, concentrate or other products produced by the Company and the timing thereof; the Company's plans and expectations for its properties and operations; and all other timing, exploration, development, operational, financial, budgetary, economic, legal, social, environmental, regulatory, and political matters that may influence or be influenced by future events or conditions.

    Such forward-looking information is based on a number of material factors and assumptions, including, but not limited in any manner to, those disclosed in any other of the Company's filings, and include: the inherent speculative nature of exploration results; the ability to explore; communications with local stakeholders; maintaining community and governmental relations; status of negotiations and potential transactions, including joint ventures; weather conditions at the Company's operations; commodity prices; the ultimate determination of and realization of Mineral Reserves; existence or realization of Mineral Resources; the development approach; availability and receipt of required approvals, titles, licenses and permits; sufficient working capital to develop and operate the mines and implement development plans; access to adequate services and supplies; foreign currency exchange rates; interest rates; access to capital markets and associated cost of funds; availability of a qualified work force; ability to negotiate, finalize, and execute relevant agreements; lack of social opposition to the Company's mines or facilities; lack of legal challenges with respect to the Company's properties; the timing and amount of future production; the ability to meet production, cost, and capital expenditure targets; timing and ability to produce studies and analyses; capital and operating expenditures; economic conditions; availability of sufficient financing; the ultimate ability to mine, process, and sell mineral products on economically favorable terms; and any and all other timing, exploration, development, operational, financial, budgetary, economic, legal, social, geopolitical, regulatory and political factors that may influence future events or conditions. While the Company considers these factors and assumptions to be reasonable based on information currently available to the Company, they may prove to be incorrect.

    The above list is not exhaustive of the factors that may affect any of the Company's forward-looking information. You should not place undue reliance on forward-looking information. Forward-looking information is only a prediction based on the Company's current expectations and the Company's projections about future events. Actual results may vary from such forward-looking information for a variety of reasons including, but not limited to, risks and uncertainties disclosed in the Company's filings on the Company's website at www.ssrmining.com, on SEDAR at www.sedar.com, on EDGAR at www.sec.gov and on the ASX at www.asx.com.au and other unforeseen events or circumstances. Other than as required by law, the Company does not intend, and undertake no obligation to update any forward-looking information to reflect, among other things, new information or future events.

    All references to "$" in this press release are to U.S. dollars unless otherwise stated.

    This press release includes Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in Canada and the Mineral Reserves and the Mineral Resources estimates are made in accordance with NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ significantly from the requirements of the SEC set out in the SEC rules that are applicable to domestic United States reporting companies. Consequently, Mineral Reserves and Mineral Resources information included in this press release may not be comparable to similar information that would generally be disclosed by domestic U.S. reporting companies subject to the reporting and disclosure requirements of the SEC. Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.

    Table 3: All step-out drill holes completed at the Ardich project since the Mineral Resource compilation cut-off date for the CDMP20 Technical Report.

    Hole ID

    From
    (m)

    To
    (m)

    Interval
    (m)

    Au g/t

    Oxidation
    State

    EOH
    Depth
    (m)

    Comments

    AR237

    N.S.I

    122.2


    AR238

    N.S.I

    169.5


    AR249

    N.S.I

    225.0


    AR250

    311.00

    316.50

    5.50

    1.18

    Sulfide

    440.0


    AR253

    219.00

    224.00

    5.00

    0.39

    Oxide

    261.9


    AR254

    N.S.I

    161.5


    AR256

    131.00

    138.00

    7.00

    1.38

    Oxide

    325.5


    145.00

    153.00

    8.00

    3.93

    Oxide


    Including

    147.00

    148.00

    1.00

    12.80

    Oxide



    207.00

    228.00

    21.00

    0.69

    Oxide


    231.00

    236.00

    5.00

    0.46

    Oxide


    261.00

    264.40

    3.40

    1.09

    Oxide


    276.30

    304.00

    27.70

    0.66

    Oxide


    AR257

    263.00

    266.00

    3.00

    0.68

    Oxide

    321.7


    AR258

    N.S.I

    449.7


    AR260

    106.00

    117.00

    11.00

    1.98

    Oxide

    305.9


    AR261

    133.40

    140.40

    7.00

    0.64

    Oxide

    271.7


    AR262

    211.50

    223.50

    12.00

    0.85

    Mixed

    232.2

    55/45 Oxide/Sulfide

    227.50

    232.20

    4.70

    1.04

    Mixed


    AR263

    105.00

    131.00

    26.00

    1.11

    Mixed

    271.5

    57/43 Sulfide/Oxide

    AR264

    385.50

    401.40

    15.90

    1.17

    Mixed

    418.3


    406.40

    418.30

    11.90

    0.80

    Sulfide


    AR265

    72.60

    77.40

    4.80

    0.53

    Oxide

    294.8


    121.40

    125.40

    4.00

    0.69

    Sulfide


    AR266

    214.00

    225.00

    11.00

    0.70

    Oxide

    346.0


    235.00

    241.00

    6.00

    1.21

    Oxide


    247.00

    263.00

    16.00

    1.99

    Oxide

    Includes 2.0 m isolated core loss.

    AR267

    141.00

    170.70

    29.70

    1.78

    Oxide

    247.5


    178.40

    190.50

    12.10

    0.96

    Oxide


    193.50

    201.50

    8.00

    0.53

    Oxide


    224.50

    228.50

    4.00

    0.33

    Oxide


    AR268

    169.00

    175.00

    6.00

    0.48

    Mixed

    191.2

    50/50 Sulfide/Oxide

    AR269

    193.00

    205.00

    12.00

    2.70

    Mixed

    254.0

    50/50 Sulfide/Oxide

    AR270

    187.00

    213.00

    26.00

    1.72

    Mixed

    302.0

    54/46 Oxide/Sulfide

    AR271

    N.S.I

    520.1


    AR272

    183.50

    191.10

    7.60

    0.44

    Oxide

    243.2


    AR273

    172.00

    176.80

    4.80

    1.92

    Oxide

    265.0


    181.30

    186.60

    5.30

    0.42

    Oxide


    191.00

    220.50

    29.50

    3.01

    Oxide

    193.00 - 194.00 m Sulfide

    Including

    202.50

    203.50

    1.00

    13.55

    Oxide


    Including

    214.50

    215.50

    1.00

    12.20

    Oxide


    AR274

    154.80

    195.50

    40.70

    7.48

    Sulfide

    281.0


    Including

    179.50

    181.50

    2.00

    14.63

    Sulfide



    Including

    186.50

    191.50

    5.00

    29.99

    Sulfide



    AR275

    N.S.I

    197.0


    AR276

    90.00

    94.00

    4.0

    0.35

    Mixed

    231.8


    97.00

    119.40

    22.4

    1.25

    Mixed


    127.50

    138.00

    10.5

    1.00

    Sulfide


    AR277

    121.10

    126.90

    5.80

    0.83

    Oxide

    297.4


    151.00

    156.00

    5.00

    0.47

    Oxide


    219.70

    223.70

    4.00

    0.36

    Oxide


    AR278

    153.00

    198.00

    45.00

    2.88

    Mixed

    242.6

    Isolated 0.6 m core loss. 67/33 Oxide/Sulfide

    221.00

    225.00

    4.00

    0.34

    Oxide


    AR279

    152.20

    203.00

    50.8

    4.02

    Mixed

    290.0

    50/50 Oxide/Sulfide, 4 m at 0.25 g/t Au from 192 m included in the mineralized interval

    Including

    170.00

    172.00

    2.0

    12.88

    Sulfide


    Including

    183.00

    185.00

    2.0

    14.78

    Sulfide


    AR280

    246.00

    270.50

    24.5

    4.18

    Mixed

    308.0

    Includes 0.7 m isolated core loss. 88/12 Oxide/Sulfide

    Including

    264.00

    265.00

    1.0

    35.10

    Sulfide


    AR281

    147.20

    152.20

    5.00

    0.96

    Oxide

    277.0


    155.00

    155.80

    0.80

    4.09

    Mixed


    162.00

    168.70

    6.70

    0.71

    Oxide


    AR282

    45.20

    51.50

    6.30

    1.09

    Sulfide

    256.9


    59.50

    63.50

    4.00

    1.40

    Sulfide


    69.50

    76.90

    7.40

    1.35

    Sulfide


    116.00

    125.50

    9.50

    3.09

    Mixed

    65/35 Oxide/Sulfide

    140.00

    146.00

    6.00

    2.66

    Mixed

    67/33 Sulfide

    AR283

    240.00

    264.00

    24.0

    1.03

    Mixed

    295.8

    64/36 Oxide/Sulfide

    AR284

    160.00

    163.00

    3.00

    1.35

    Oxide

    310.6


    227.00

    242.00

    15.00

    1.30

    Mixed

    60/40 Oxide/Sulfide

    AR285

    88.10

    92.00

    3.9

    0.69

    Mixed

    273.1

    51/49 Oxide/Sulfide

    AR286

    186.00

    207.00

    21.0

    1.57

    Sulfide

    316.0

    Includes 2.5 m isolated core loss.

    AR287

    88.10

    102.50

    14.40

    0.88

    Oxide

    293.0

    100.5 - 102.5 m Sulfide

    106.50

    122.60

    16.10

    1.62

    Oxide


    126.20

    131.50

    5.30

    0.97

    Mixed


    134.30

    139.40

    5.10

    1.11

    Mixed


    AR288

    201.00

    214.50

    13.5

    0.73

    Mixed

    240.6

    60/40 Oxide/Sulfide

    217.50

    233.40

    15.9

    1.15

    Oxide

    Isolated 1.5 m core loss.

    AR289

    203.10

    212.40

    9.30

    4.79

    Oxide

    267.3

    209.1 - 210.1 m Sulfide

    217.10

    224.10

    7.00

    1.26

    Oxide


    AR290

    135.50

    147.00

    11.50

    0.84

    Oxide

    253.0


    166.70

    181.00

    14.30

    2.38

    Mixed

    55/45 Oxide/Sulfide

    AR291

    N.S.I

    161.1


    AR292

    172.70

    180.80

    8.1

    1.21

    Oxide

    290.0


    AR293

    N.S.I

    238.0


    AR294

    149.30

    158.00

    8.7

    1.75

    Oxide

    223.0


    AR295

    124.80

    152.00

    27.2

    0.62

    Oxide

    242.1


    AR298

    136.20

    140.00

    3.80

    1.25

    Oxide

    225.5


    145.30

    181.00

    35.70

    1.98

    Oxide

    158.8 - 159.8 m, 160.8 - 161.8 m and 162.8 - 163.8 m Sulfide

    AR299

    83.20

    89.00

    5.80

    1.32

    Sulfide

    172.1

    86.0 - 87.0m Oxide

    100.00

    105.70

    5.70

    1.23

    Oxide


    109.70

    118.70

    9.00

    0.42

    Oxide


    139.80

    140.50

    0.70

    11.40

    Sulfide


    AR301

    192.00

    208.90

    16.90

    0.91

    Mixed

    245.1

    63/37 Sulfide  -  Oxide

    AR302

    N.S.I

    196.3


    AR303

    135.50

    143.00

    7.50

    3.33

    Oxide

    262.5

    138.2 - 139.2 m Sulfide

    Including

    138.20

    139.20

    1.00

    11.40

    Sulfide

    53/47 Sulfide  -  Oxide


    158.00

    167.00

    9.00

    0.36

    Sulfide


    173.00

    180.00

    7.00

    0.48

    Sulfide

    178.0 - 179.0 m Oxide

    224.20

    227.20

    3.00

    0.43

    Oxide


    AR305

    29.50

    52.00

    22.50

    1.03

    Oxide

    102.1

    49.0 m - 50.0 m and 51.0 - 52.0 m Sulfide

    91.20

    94.20

    3.00

    0.38

    Oxide


    AR307

    146.10

    164.60

    18.50

    3.48

    Mixed

    170.0

    73/27 Oxide/Sulfide

    AR309

    30.80

    41.70

    10.90

    2.63

    Oxide

    158.5

    includes 0.5 m isolated core loss

    45.70

    52.50

    6.80

    1.70

    Oxide

    51.5 - 52.0 m Sulfide

    134.80

    137.80

    3.00

    0.33

    Oxide


    AR310

    123.10

    131.80

    8.70

    1.20

    Oxide

    228.2


    144.80

    173.50

    28.70

    3.20

    Mixed

    63/37 Oxide/Sulfide

    Including

    149.80

    150.80

    1.00

    11.65

    Oxide



    182.50

    192.50

    10.00

    3.41

    Mixed

    63/37 Oxide/Sulfide

    Including

    189.50

    190.50

    1.00

    11.50

    Oxide


    AR312

    79.20

    85.30

    6.10

    0.81

    Mixed

    200.2

    60/40 Oxide/Sulfide

    AR313

    171.20

    197.20

    26.00

    1.72

    Mixed

    197.2

    50/50 Oxide/Sulfide

    AR314

    36.90

    56.10

    19.20

    1.38

    Oxide

    201.9


    AR315

    83.70

    93.80

    10.10

    1.74

    Oxide

    167.0

    Includes 0.5 m isolated core loss

    97.80

    103.20

    5.40

    1.19

    Oxide


    109.20

    132.50

    23.30

    1.43

    Oxide


    Including

    120.70

    121.70

    1.00

    13.30

    Oxide


    AR316

    206.00

    214.30

    8.30

    4.73

    Oxide

    272.5


    Including

    207.00

    208.00

    1.00

    22.00

    Oxide



    230.00

    240.50

    10.50

    0.32

    Oxide

    237.5 - 238.5 m and 239.5 - 240.5 m Sulfide

    AR317

    202.00

    221.00

    19.00

    3.05

    Sulfide

    228.0


    AR318

    152.50

    157.50

    5.00

    0.42

    Oxide

    194.9

    Includes 1.1 m isolated core loss

    164.50

    167.50

    3.00

    0.57

    Oxide


    AR319

    146.60

    159.30

    12.70

    3.08

    Mixed

    238.0

    55/45 Oxide/Sulfide

    AR320

    108.60

    118.00

    9.40

    1.73

    Oxide

    194.0

    114.0 - 115.0 m Sulfide

    130.20

    137.20

    7.00

    7.06

    Mixed

    72/28 Oxide/Sulfide

    Including

    131.20

    133.20

    2.00

    21.28

    Sulfide



    140.50

    154.20

    13.70

    1.19

    Mixed

    76/24 Oxide/ Sulfide

    AR321

    105.00

    117.40

    12.40

    0.85

    Mixed

    158.4

    49/51 Oxide/Sulfide

    AR322

    115.00

    122.00

    7.00

    3.08

    Oxide

    224.0



    125.00

    129.00

    4.00

    0.88

    Oxide


    AR324

    118.00

    125.00

    7.00

    2.08

    Oxide

    200.0

    124.0 - 125.0 m Sulfide


    129.00

    134.00

    5.00

    5.96

    Sulfide


    Including

    133.00

    134.00

    1.00

    11.35

    Sulfide



    175.00

    180.00

    5.00

    2.15

    Sulfide


    AR325

    177.40

    181.70

    4.30

    1.21

    Oxide

    305.5

    179.4 - 180.4 m Sulfide

    190.30

    194.20

    3.90

    0.58

    Oxide


    220.80

    225.00

    4.20

    0.42

    Sulfide


    231.00

    238.00

    7.00

    1.35

    Oxide

    237.0 - 238.0 m Sulfide

    AR326

    41.00

    62.40

    21.40

    1.50

    Oxide

    178.7


    92.50

    106.50

    14.00

    1.22

    Oxide


    109.50

    119.50

    10.00

    1.07

    Oxide


    122.50

    125.80

    3.30

    0.42

    Oxide


    AR327

    172.50

    210.60

    38.10

    6.38

    Sulfide

    210.6

    172.5 - 175.5 m and 208.4 - 210.6 m Sulfide, includes 0.3 m isolated core loss

    Including

    185.50

    186.50

    1.00

    14.00

    Sulfide


    Including

    192.50

    193.50

    1.00

    16.05

    Sulfide


    Including

    200.50

    201.50

    1.00

    13.80

    Sulfide


    Including

    204.50

    205.50

    1.00

    13.50

    Sulfide


    Including

    206.30

    207.10

    0.80

    11.05

    Sulfide


    AR331

    169.60

    173.60

    4.00

    0.64

    Oxide

    286.5


    177.60

    183.70

    6.10

    0.81

    Oxide


    AR332

    107.60

    127.60

    20.00

    0.46

    Mixed

    201.3

    60/40 Oxide/Sulfide

    AR333

    157.20

    164.00

    6.80

    1.30

    Oxide

    261.0


    AR334

    191.40

    208.30

    16.90

    5.46

    Sulfide

    242.5

    205.3 - 208.3 m Oxide

    Including

    194.30

    195.30

    1.00

    15.20

    Sulfide


    AR336

    155.20

    175.40

    20.20

    2.78

    Mixed

    264.0

    52/48 Oxide/Sulfide

    178.40

    182.50

    4.10

    2.32

    Sulfide

    180.5 - 181.5 m Oxide

    202.30

    212.30

    10.00

    0.37

    Mixed

    70/30 Oxide/Sulfide

    AR337

    75.00

    88.00

    13.00

    0.96

    Oxide

    159.2


    AR338

    93.90

    96.90

    3.00

    0.77

    Oxide

    149.3


    AR340

    11.20

    24.60

    13.40

    0.94

    Oxide

    266.2


    37.90

    41.60

    3.70

    0.43

    Oxide

    Includes 0.4 m isolated core loss

    AR341

    200.50

    213.30

    12.80

    0.93

    Mixed

    259.3

    55/45 Oxide/Sulfide

    AR344

    111.60

    132.00

    20.40

    1.44

    Mixed

    251.5

    51/49 Oxide/Sulfide

    137.00

    146.70

    9.70

    2.15

    Mixed

    31/69 Oxide/Sulfide

    201.40

    223.00

    21.60

    3.30

    Mixed

    77/23 Oxide/Sulfide, includes 0.7 m isolated core loss

    Including

    217.40

    219.40

    2.00

    11.55

    Sulfide


    AR345

    131.20

    150.50

    19.30

    2.84

    Mixed

    295.4

    30/70 Oxide/Sulfide, includes 0.5 m isolated core loss

    157.20

    170.50

    13.30

    1.83

    Oxide

    163.2 - 165.2 m Sulfide

    176.50

    185.00

    8.50

    3.29

    Mixed

    73/27 Oxide/Sulfide

    AR346

    85.00

    89.70

    4.70

    1.13

    Oxide

    155.9


    AR347

    98.30

    108.00

    9.70

    0.70

    Oxide

    196.8


    AR349

    141.00

    145.00

    4.00

    1.66

    Oxide

    222.5


    AR350

    45.60

    66.00

    20.40

    1.21

    Oxide

    287.8

    Includes 0.4 m isolated core loss

    74.00

    79.00

    5.00

    0.35

    Oxide


    AR351

    167.00

    179.00

    12.00

    0.95

    Oxide

    215.0


    193.00

    199.00

    6.00

    0.45

    Oxide


    AR352

    122.00

    138.20

    16.20

    0.76

    Mixed

    199.8

    43/57 Oxide/Sulfide, includes 0.4 m isolated core loss

    AR353

    145.00

    153.60

    8.60

    5.27

    Oxide

    221.2


    Including

    152.00

    153.60

    1.60

    16.55

    Oxide



    181.50

    188.50

    7.00

    0.40

    Oxide


    199.00

    207.00

    8.00

    0.44

    Oxide


    AR354

    120.30

    125.30

    5.00

    2.00

    Oxide

    263.2

    121.3 - 122.3 m Sulfide

    128.30

    177.10

    48.80

    0.89

    Mixed

    72/28 Oxide/Sulfide

    214.60

    219.90

    5.30

    1.04

    Oxide

    Includes 0.6 m isolated core loss

    AR355

    83.00

    91.00

    8.00

    0.34

    Mixed

    224.5

    25/75 Oxide/Sulfide

    99.00

    104.00

    5.00

    0.41

    Sulfide


    110.00

    131.80

    21.80

    1.02

    Oxide

    111.0 - 114.2 m Sulfide

    AR356

    163.00

    225.70

    62.70

    2.98

    Mixed

    248.3

    57/43 Oxide/Sulfide, includes 0.8 m isolated core loss

    Including

    200.20

    201.20

    1.00

    14.45

    Oxide


    Including

    203.30

    204.30

    1.00

    11.85

    Oxide


    Including

    205.30

    208.70

    3.40

    13.43

    Oxide

     Includes 0.4 m isolated core loss

    Including

    212.70

    213.70

    1.00

    12.55

    Oxide


    AR357

    202.60

    224.50

    21.90

    7.15

    Sulfide

    269.8

    202.6 - 203.8 m and 221.50 - 222.5 m Oxide

    Including

    208.00

    209.00

    1.00

    15.00

    Sulfide


    Including

    210.00

    211.00

    1.00

    11.10

    Sulfide


    Including

    212.00

    215.00

    3.00

    14.58

    Sulfide


    Including

    215.70

    217.00

    1.30

    14.70

    Sulfide


    AR358

    51.00

    68.00

    17.00

    0.48

    Oxide

    191.0

    Includes 0.3 m isolated core loss

    AR359

    89.80

    100.40

    10.60

    2.86

    Oxide

    150.2

    96.0 - 97.0 m Sulfide

    122.30

    126.30

    4.00

    1.47

    Oxide


    134.30

    138.70

    4.40

    0.97

    Oxide


    AR360

    104.30

    115.90

    11.60

    1.73

    Oxide

    216.2


    AR361

    173.50

    199.30

    25.80

    6.83

    Mixed

    217.5

    61/39 Oxide/Sulfide

    Including

    181.50

    182.50

    1.00

    11.15

    Sulfide


    Including

    188.50

    189.50

    1.00

    10.80

    Oxide


    Including

    192.50

    193.50

    1.00

    11.05

    Oxide


    Including

    194.50

    195.30

    0.80

    11.95

    Oxide


    AR362

    123.00

    133.00

    10.00

    2.02

    Oxide

    250.0


    154.00

    159.00

    5.00

    0.36

    Sulfide


    168.50

    178.00

    9.50

    1.10

    Oxide


    AR363

    39.30

    44.90

    5.60

    0.30

    Oxide

    117.9


    AR364

    98.80

    103.50

    4.70

    0.59

    Oxide

    285.5


    121.20

    128.30

    7.10

    1.34

    Oxide


    AR365

    177.50

    196.40

    18.90

    4.63

    Oxide

    269.4

    189.6 - 92.4 m Sulfide

    Including

    190.40

    192.40

    2.00

    24.08

    Sulfide


    AR366

    156.20

    161.20

    5.00

    0.62

    Oxide

    215.0

    160.2 - 161.2 m Sulfide

    172.90

    202.10

    29.20

    1.80

    Mixed

    70/30 Oxide/Sulfide, includes 1.5 m isolated core loss

    AR367

    125.90

    129.70

    3.80

    0.59

    Oxide

    165.7


    AR368

    135.20

    147.20

    12.00

    1.61

    Oxide

    211.0

    144.2 - 147.2 m Sulfide


    150.20

    162.50

    12.30

    0.88

    Mixed

    35/65 Oxide/Sulfide

    AR369

    166.00

    178.70

    12.70

    4.26

    Mixed

    226.0

    61/39 Oxide/Sulfide

    Including

    167.90

    168.70

    0.80

    20.30

    Oxide



    203.50

    209.50

    6.00

    0.41

    Oxide


    AR370

    186.50

    202.90

    16.40

    1.65

    Mixed

    257.0

    57/43 Oxide/Sulfide, includes 0.3 m isolated core loss

    207.00

    219.30

    12.30

    0.66

    Oxide


    AR371

    132.30

    136.30

    4.00

    0.60

    Oxide

    165.9


    AR372

    116.60

    125.60

    9.00

    2.53

    Oxide

    200.0


    AR375

    185.00

    209.00

    24.00

    2.07

    Mixed

    258.0

    55/45 Oxide/Sulfide

    218.00

    226.50

    8.50

    0.50

    Oxide


    AR377

    15.40

    85.50

    70.10

    1.71

    Oxide

    153.9

    Includes 0.6 m isolated core loss

    AR378

    171.40

    189.60

    18.20

    1.71

    Mixed

    214.1

    50/50 Oxide/Sulfide

    AR380

    31.60

    37.00

    5.40

    0.99

    Oxide

    80.0


    AR393

    29.30

    46.30

    17.00

    1.26

    Oxide

    266.2

    34.3 - 35.3 m Sulfide

    77.50

    80.80

    3.30

    0.68

    Oxide


    117.00

    148.60

    31.60

    4.04

    Mixed

    44/56 Oxide/Sulfide, includes 0.4 m isolated core loss

    Including

    125.00

    128.00

    3.00

    16.35

    Sulfide


    Including

    131.00

    132.00

    1.00

    10.95

    Sulfide



    202.40

    206.40

    4.00

    0.50

    Sulfide


    220.20

    223.20

    3.00

    0.46

    Mixed

    33/67 Oxide/Sulfide

    AR395

    74.50

    82.20

    7.70

    1.00

    Oxide

    211.0

    81.2 - 82.2 m Sulfide

    89.20

    97.80

    8.60

    0.65

    Oxide

    89.2 - 91.2 m Sulfide

    112.80

    122.80

    10.00

    0.38

    Oxide


    125.80

    131.50

    5.70

    0.41

    Oxide


    AR397

    124.80

    127.90

    3.10

    1.09

    Sulfide

    194.0

    126.0 - 127.9 m Oxide, includes 0.3 m isolated core loss

    131.40

    142.30

    10.90

    1.00

    Sulfide

    132.4 - 133.4 m and 136.3 - 138.3 Oxide

    145.50

    150.50

    5.00

    0.61

    Oxide


    167.50

    170.50

    3.00

    0.32

    Oxide


    AR398

    207.00

    225.00

    18.00

    1.48

    Oxide

    265.0

    218.0 - 220.0 m and 224.0 - 225.0 m Sulfide

    230.00

    249.00

    19.00

    1.09

    Oxide

    231.0 - 232.0, 236.0 - 237.0 m and 240.3 - 241.0 m Sulfide

    AR400

    164.30

    175.80

    11.50

    1.25

    Sulfide

    308.5

    174.8 - 175.8 Oxide

    178.80

    210.00

    31.20

    1.65

    Mixed

    78/22 Oxide/Sulfide, includes 0.9 m isolated core loss

    AR401

    135.50

    140.00

    4.50

    2.58

    Mixed

    210.4

    46/54 Oxide/Sulfide

    AR405

    91.50

    108.50

    17.00

    0.52

    Mixed

    185.0

    77/23 Oxide/Sulfide

    137.50

    141.50

    4.00

    0.42

    Oxide


    163.00

    171.00

    8.00

    0.33

    Oxide


    AR407

    87.10

    90.70

    3.60

    0.40

    Oxide

    251.3


    144.60

    198.60

    54.00

    3.68

    Oxide

    65/35 Oxide/Sulfide, includes 2.5 m isolated core loss

    Including

    154.10

    155.10

    1.00

    16.85

    Oxide

    33/67 Oxide/Sulfide

    Including

    157.10

    159.10

    2.00

    15.43

    Oxide

    33/67 Oxide/Sulfide

    Including

    168.60

    169.60

    1.00

    12.60

    Sulfide

    67/33 Oxide/Sulfide


    216.70

    222.70

    6.00

    1.34

    Oxide

    220.7 - 221.7 m Sulfide

    230.70

    234.50

    3.80

    0.32

    Oxide


    AR408

    N.S.I

    173.0


    AR410

    111.00

    124.10

    13.10

    0.40

    Mixed

    200.2

    61/39 Oxide/Sulfide

    AR412

    13.00

    35.90

    22.90

    0.72

    Oxide

    150.7

    17.0 - 18.0 m Sulfide

    129.20

    133.20

    4.00

    0.37

    Oxide


    AR413

    N.S.I

    221.5


    AR414

    153.00

    167.00

    14.00

    7.50

    Mixed

    179.0

    70/30 Oxide/Sulfide

    Including

    153.00

    157.40

    4.40

    13.19

    Mixed

    25/75 Oxide/Sulfide

    AR415

    65.50

    68.50

    3.00

    0.35

    Oxide

    186.5


    AR416

    141.00

    147.30

    6.30

    0.78

    Oxide

    213.4


    153.50

    163.40

    9.90

    1.10

    Oxide

    161.2 - 163.4 m Sulfide

    166.40

    179.00

    12.60

    1.15

    Oxide


    AR417

    0.00

    49.80

    49.80

    2.20

    Oxide

    125.0


    112.50

    117.50

    5.00

    1.01

    Oxide


    AR418

    0.00

    5.00

    5.00

    1.16

    Oxide

    107.2


    15.00

    24.00

    9.00

    0.66

    Oxide


    33.00

    36.00

    3.00

    0.69

    Oxide


    AR419

    89.60

    110.50

    20.90

    0.62

    Mixed

    213.5

    70/30 Oxide/Sulfide

    122.50

    128.50

    6.00

    0.36

    Oxide


    147.50

    163.00

    15.50

    0.38

    Oxide


    167.50

    172.50

    5.00

    0.40

    Oxide


    AR420

    N.S.I

    335.9


    AR421

    136.50

    158.80

    22.30

    2.59

    Mixed

    200.8

    60/40 Oxide/Sulfide


    165.80

    177.50

    11.70

    0.67

    Oxide


    AR422

    N.S.I

    152.6


    AR423

    N.S.I

    173.5


    AR424

    131.40

    159.50

    28.10

    2.22

    Oxide

    182.5

    133.5 - 135.5 m Sulfide

    AR425

    21.00

    36.30

    15.30

    0.65

    Oxide

    161.8


    49.00

    55.30

    6.30

    0.76

    Oxide


    92.40

    101.20

    8.80

    1.02

    Oxide


    AR426

    3.00

    11.00

    8.00

    0.39

    Oxide

    54.4


    AR427

    N.S.I

    155.50



    Significant gold intervals reported at a nominal 0.3 g/t gold cut-off and with a maximum 2.5m contiguous dilution are given in Table 1. All thicknesses are down hole length and true widths are not known at this stage.

    Table 4: All In-fill drill holes completed at the Ardich Project since the Mineral Resource compilation cut-off date for the CDMP20 Technical Report

    Hole ID

    From (m)

    To
    (m)

    Interval
    (m)

    Au
    g/t

    Oxidation
    State

    EOH
    Depth
    (m)

    Comments

    AR234

    148.20

    152.20

    4.00

    0.93

    Oxide

    262.4


    166.20

    169.20

    3.00

    0.47

    Oxide


    178.20

    181.20

    3.00

    0.67

    Oxide


    195.20

    199.70

    4.50

    0.71

    Oxide


    AR235

    178.00

    187.50

    9.50

    1.45

    Oxide

    348.2

    80/20 Oxide/Sulfide

    AR236

    177.60

    181.60

    4.00

    0.70

    Oxide

    297.0


    184.60

    187.60

    3.00

    0.57

    Oxide


    AR239

    N.S.I

    101.5


    AR240

    127.00

    134.00

    7.00

    1.78

    Oxide

    204.6


    147.90

    152.60

    4.70

    1.42

    Oxide


    164.20

    169.20

    5.00

    0.87

    Sulfide


    186.20

    189.20

    3.00

    0.49

    Oxide

    186.2 - 187.2m Sulfide

    AR241

    182.80

    203.00

    20.20

    1.10

    Oxide

    244.6


    229.00

    239.20

    10.20

    0.84

    Oxide

    70/30 Oxide/Sulfide

    AR242

    172.30

    177.30

    5.00

    0.35

    Oxide

    254.7


    205.30

    209.30

    4.00

    0.40

    Oxide


    218.30

    219.20

    0.90

    4.64

    Oxide


    AR243

    157.60

    175.30

    17.70

    1.40

    Oxide

    258.4


    202.30

    217.80

    15.50

    0.59

    Oxide


    AR244

    159.00

    166.30

    7.30

    4.00

    Sulfide

    224.7


    177.00

    185.00

    8.00

    0.43

    Oxide


    AR245

    139.00

    152.00

    13.00

    1.50

    Oxide

    349.4


    AR246

    152.00

    188.00

    36.00

    5.78

    Sulfide

    317.0

    152.0 - 154.7m Oxide

    Including

    169.00

    172.00

    3.00

    13.68

    Sulfide


    Including

    177.00

    178.00

    1.00

    11.95

    Sulfide


    Including

    181.40

    184.40

    3.00

    15.10

    Sulfide


    AR247

    102.50

    107.50

    5.00

    0.76

    Oxide

    237.8


    117.50

    124.50

    7.00

    0.53

    Oxide


    228.50

    233.50

    5.00

    0.35

    Oxide


    AR248

    149.00

    194.60

    45.60

    3.09

    Oxide

    260.2

    Isolated 4 meter core loss.

    Including

    168.50

    172.90

    4.40

    11.45

    Oxide

    Isolated 0.6 meter core loss.

    AR251

    151.60

    168.70

    17.10

    1.46

    Oxide

    252.8

    85/15 Oxide/Sulfide

    184.70

    190.50

    5.80

    1.23

    Sulfide

    Isolated 0.4 meter core loss.

    AR252

    165.70

    178.00

    12.30

    1.71

    Oxide

    328.1


    185.00

    195.00

    10.00

    1.78

    Oxide


    AR255

    88.00

    102.80

    14.80

    3.32

    Oxide

    257.9


    Including

    97.00

    98.00

    1.00

    14.40

    Oxide



    156.70

    165.60

    8.90

    0.40

    Mixed


    AR259

    135.00

    139.30

    4.30

    3.77

    Oxide

    264.5


    Including

    136.30

    137.30

    1.00

    11.45

    Oxide


    AR296

    88.40

    141.20

    52.8

    0.74

    Oxide

    230.0

    Includes 0.5 meter isolated core loss. 93/7 Oxide/Sulfide

    AR297

    162.30

    166.00

    3.70

    0.75

    Sulfide

    273.0


    169.00

    172.00

    3.00

    0.79

    Sulfide


    177.00

    187.00

    10.00

    2.08

    Sulfide


    AR300

    121.00

    157.90

    36.90

    2.60

    Mixed

    197.0

    Includes 0.5 meter isolated core loss 75/25 Oxide/Sulfide

    Including

    138.60

    139.60

    1.00

    11.05

    Sulfide

    33/67 Oxide/Sulfide

    AR304

    146.00

    162.00

    16.00

    8.30

    Mixed

    241.7

    38/62 Oxide/Sulfide

    Including

    148.00

    149.00

    1.00

    11.40

    Oxide



    Including

    151.00

    157.00

    6.00

    16.68

    Sulfide


    154.00-155.00 Oxide


    165.00

    181.00

    16.00

    0.60

    Oxide



    AR306

    113.90

    124.20

    10.30

    2.78

    Mixed

    218.0

    50/50 Oxide/Sulfide

    126.90

    131.70

    4.80

    1.61

    Sulfide


    147.20

    152.20

    5.00

    0.42

    Sulfide

    includes 0.5 meter isolated core loss

    AR308

    86.10

    110.20

    24.10

    2.92

    Mixed

    170.0

    88/12 Oxide/Sulfide

    Including

    87.10

    88.10

    1.00

    14.40

    Oxide



    122.50

    137.50

    15.00

    0.82

    Oxide

    122.50-124.50 and 125.50-126.50 Sulfide

    AR311

    118.00

    126.00

    8.00

    1.25

    Mixed

    182.5

    75/25 Oxide/Sulfide, includes 0.9 meter isolated core loss

    148.00

    152.00

    4.00

    0.61

    Oxide


    AR323

    149.70

    160.70

    11.00

    0.59

    Oxide

    268.0

    Includes 0.7 meter isolated core loss 155.90-156.90 Sulfide

    AR328

    159.50

    169.50

    10.00

    2.45

    Mixed

    227.0

    40/60 Oxide/Sulfide

    177.50

    189.00

    11.50

    1.57

    Mixed

    33/67 Oxide/Sulfide

    AR329

    163.50

    168.00

    4.50

    0.65

    Oxide

    250.7

    167.3 - 168.0 m Sulfide

    AR330

    21.00

    42.30

    21.30

    1.96

    Oxide

    190.6

    23.7 - 24.7 m Sulfide

    AR335

    24.70

    45.20

    20.50

    1.07

    Oxide

    126.8


    84.00

    94.00

    10.00

    0.50

    Oxide


    AR339

    171.00

    193.00

    22.00

    2.71

    Sulfide

    231.8

    186.0 - 187.0 m and 192.0 - 193.0 m Oxide

    Including

    179.00

    180.30

    1.30

    12.00

    Sulfide


    AR342

    150.60

    154.60

    4.00

    0.84

    Oxide

    254.5


    162.40

    167.40

    5.00

    0.68

    Oxide


    192.80

    201.00

    8.20

    0.67

    Mixed

    28/72 Oxide/Sulfide

    AR343

    166.50

    176.20

    9.70

    0.94

    Oxide

    278.1

    175.2 - 176.2 m Sulfide, includes 0.5 meter isolated core loss

    AR348

    159.30

    173.90

    14.60

    1.58

    Oxide

    272.0

    171.9 - 173.9 m Sulfide, includes 1.3 meter isolated core loss

    AR373

    142.30

    164.30

    22.00

    1.54

    Mixed

    179.1

    82/18 Oxide/Sulfide

    AR374

    36.00

    83.00

    47.00

    0.86

    Mixed

    135.3

    59/41 Oxide/Sulfide

    AR376

    48.00

    74.50

    26.50

    2.46

    Oxide

    160.5


    Including

    65.60

    66.60

    1.00

    13.75

    Oxide



    82.50

    98.00

    15.50

    0.90

    Mixed

    75/25 Oxide/Sulfide

    AR379

    96.20

    157.00

    60.80

    3.83

    Oxide

    254.1

    116.7- 117.7 m, 137.5 - 142.5 m and 144.5 - 145.5 m Sulfide

    Including

    102.20

    103.20

    1.00

    15.10

    Oxide



    161.00

    190.00

    29.00

    1.85

    Mixed

    84/16 Oxide/Sulfide

    193.00

    220.00

    27.00

    1.00

    Oxide


    AR381

    45.00

    71.60

    26.60

    2.90

    Oxide

    155.0

    68.6 - 71.6 m Sulfide

    Including

    49.00

    50.00

    1.00

    14.35

    Oxide



    119.60

    122.60

    3.00

    0.54

    Oxide


    AR382

    15.00

    18.00

    3.00

    0.71

    Oxide

    125.0


    28.00

    32.00

    4.00

    0.33

    Oxide


    35.00

    39.00

    4.00

    0.45

    Oxide


    42.70

    88.40

    45.70

    1.68

    Oxide

    73.5 - 74.5 m, 79.5 - 81.4 m and 85.4 - 88.4 m Sulfide

    AR383

    52.60

    81.20

    28.60

    1.01

    Oxide

    146.0

    Includes 1.2 meter isolated core loss

    AR384

    57.30

    73.50

    16.20

    2.59

    Oxide

    87.5

    61/39 Oxide/Sulfide

    AR385

    66.70

    75.00

    8.30

    3.60

    Oxide

    167.0

    67.8 - 70.0 m Sulfide

    Including

    67.80

    68.80

    1.00

    10.95

    Sulfide



    78.00

    86.00

    8.00

    0.46

    Oxide



    92.00

    96.00

    4.00

    1.23

    Oxide



    112.00

    151.50

    39.50

    1.67

    Mixed

    47/53 Oxide/Sulfide

    AR386

    51.80

    76.00

    24.20

    1.47

    Oxide

    150.5

    57.6 - 58.8 m Sulfide, includes 0.4 meter isolated core loss

    AR387

    121.10

    141.50

    20.40

    4.15

    Oxide

    192.7


    164.90

    168.10

    3.20

    0.55

    Sulfide


    AR388

    167.20

    171.20

    4.00

    1.30

    Mixed

    215.5

    50/50 Oxide/Sulfide

    178.50

    200.30

    21.80

    0.69

    Mixed

    44/56 Oxide/Sulfide

    210.50

    214.50

    4.00

    0.75

    Sulfide

    210.5 - 211.5 m Oxide

    AR389

    35.40

    38.40

    3.00

    0.34

    Oxide

    121.6


    41.40

    55.80

    14.40

    0.54

    Oxide


    58.80

    65.20

    6.40

    0.69

    Oxide


    AR390

    156.50

    188.80

    32.30

    3.56

    Mixed

    239.9

    62/38 Oxide/Sulfide

    Including

    163.30

    164.30

    1.00

    13.10

    Sulfide

    169.0 - 169.8 m Oxide

    Including

    169.00

    169.80

    0.80

    10.35

    Oxide


    AR391

    43.70

    63.30

    19.60

    0.81

    Oxide

    151.5


    144.40

    147.40

    3.00

    0.95

    Sulfide

    145.4 - 146.4 m Oxide

    AR392

    134.60

    157.70

    23.10

    1.35

    Mixed

    181.1

    31/69 Oxide/Sulfide

    AR394

    12.30

    50.80

    38.50

    1.62

    Oxide

    167.0

    15.3 - 16.3 m and 36.3 - 37.7 m Sulfide

    107.00

    111.00

    4.00

    0.65

    Oxide


    AR396

    0.00

    8.00

    8.00

    0.44

    Oxide

    140.2


    17.00

    36.10

    19.10

    1.32

    Oxide


    43.10

    53.10

    10.00

    0.59

    Oxide


    AR399

    10.00

    56.10

    46.10

    0.97

    Oxide

    185.0


    AR402

    205.00

    216.00

    11.00

    1.05

    Oxide

    285.0


    232.00

    263.00

    31.00

    2.08

    Oxide


    266.00

    270.00

    4.00

    0.57

    Oxide


    AR403

    9.00

    46.00

    37.00

    0.91

    Oxide

    116.1


    AR404

    4.00

    53.70

    49.70

    1.67

    Oxide

    114.4

    4.0 - 5.0 m, 28.0 - 29.0 m and 35.0 - 36.6 m Sulfide

    57.70

    67.00

    9.30

    0.43

    Oxide

    65.0 - 67.0 m Sulfide

    AR406

    60.40

    120.20

    59.80

    1.38

    Oxide

    181.0

    111.0 - 111.8 m Sulfide, includes 0.8 m isolated core loss

    133.00

    137.00

    4.00

    0.30

    Sulfide


    153.00

    160.00

    7.00

    1.16

    Mixed

    43/57 Oxide/Sulfide

    AR409

    N.S.I

    105.9


    AR411

    138.80

    152.10

    13.30

    0.55

    Oxide

    173.6

    140.0 - 141.1 m and 146.1 - 147.1 m Sulfide

    157.10

    164.10

    7.00

    0.42

    Oxide



    Significant gold intervals reported at a nominal 0.3 g/t gold cut-off and with a maximum 2.5m contiguous dilution are given in Table 2. All thicknesses are down hole length and true widths are not known at this stage.

    Supporting Drilling Information to SSR Mining Announcement

    This document provides supporting drill collar locations and composite assay results for the Çakmaktepe Extension (Ardich) drilling program referenced in the announcement "SSR Mining Announces Positive Exploration Drill Results for the Çakmaktepe Extension (Ardich) Project, including 40.7 meters at 7.48 gr/t Au", August 10, 2021.

    Drill collar locations are surveyed in UTM Zone 37N, ED50 grid using differential GPS in units of meters. All drilling was diamond core drilling with HQ and PQ core sizes. HQ is 63.5mm and PQ is 85 mm in diameter.

    Drill Collar Coordinates

    Hole ID

    Easting

    Northing

    Elevation

    Azimuth

    Dip

    End of
    Hole (m)

    AR234

    463941.87

    4366966.54

    1228.71

    350

    -80

    262.40

    AR235

    463757.42

    4366980.33

    1209.65

    350

    -70

    348.20

    AR236

    463896.45

    4366894.03

    1235.16

    250

    -80

    297.00

    AR237

    464349.46

    4366759.36

    1325.28

    40

    -60

    122.20

    AR238

    464573.10

    4366489.99

    1429.08

    130

    -60

    169.50

    AR239

    463718.93

    4366877.32

    1222.19

    260

    -60

    101.50

    AR240

    463880.36

    4366769.36

    1260.53

    190

    -70

    204.60

    AR241

    463893.09

    4366891.86

    1235.32

    210

    -75

    244.60

    AR242

    463853.64

    4366983.73

    1218.77

    0

    -90

    254.70

    AR243

    463884.72

    4366766.95

    1260.94

    65

    -75

    258.40

    AR244

    463972.75

    4366843.93

    1248.97

    90

    -75

    224.70

    AR245

    463778.06

    4366769.17

    1253.78

    190

    -85

    349.40

    AR246

    463716.05

    4366870.75

    1222.62

    200

    -60

    317.00

    AR247

    463955.04

    4366559.86

    1333.82

    50

    -70

    237.80

    AR248

    463856.78

    4366662.33

    1296.29

    160

    -70

    260.20

    AR249

    464532.44

    4366333.85

    1486.91

    140

    -60

    225.00

    AR250

    464226.27

    4366846.72

    1283.15

    40

    -60

    440.00

    AR251

    463955.12

    4366559.47

    1334.52

    0

    -90

    252.80

    AR252

    463854.61

    4366661.19

    1296.20

    300

    -80

    328.10

    AR253

    464227.29

    4366845.59

    1282.94

    260

    -80

    261.90

    AR254

    464715.30

    4366291.09

    1513.90

    300

    -60

    161.50

    AR255

    464006.09

    4366742.33

    1271.96

    130

    -60

    257.90

    AR256

    464186.06

    4366674.17

    1320.06

    45

    -60

    325.50

    AR257

    464208.93

    4366748.54

    1304.73

    320

    -60

    321.70

    AR258

    464573.50

    4366489.63

    1428.97

    30

    -60

    449.70

    AR259

    464006.75

    4366741.44

    1271.30

    340

    -75

    264.50

    AR260

    464188.38

    4366677.21

    1320.36

    315

    -70

    305.90

    AR261

    464205.99

    4366748.04

    1304.60

    260

    -75

    271.70

    AR262

    463796.83

    4366413.10

    1346.47

    10

    -75

    232.20

    AR263

    463625.32

    4366349.04

    1288.84

    40

    -75

    271.50

    AR264

    464893.55

    4366544.08

    1496.70

    220

    -80

    418.30

    AR265

    464155.15

    4366434.11

    1414.38

    230

    -75

    294.80

    AR266

    463795.72

    4366410.92

    1346.71

    10

    -75

    346.00

    AR267

    463802.69

    4366602.86

    1288.81

    65

    -70

    247.50

    AR268

    464154.17

    4366435.12

    1414.90

    340

    -75

    191.20

    AR269

    463560.76

    4366637.57

    1229.06

    75

    -75

    254.00

    AR270

    463614.82

    4366728.82

    1218.90

    270

    -60

    302.00

    AR271

    464725.20

    4366907.57

    1470.74

    220

    -70

    520.10

    AR272

    463633.79

    4366565.06

    1253.38

    265

    -60

    243.20

    AR273

    463822.36

    4366492.13

    1336.35

    60

    -65

    265.00

    AR274

    463617.37

    4366732.93

    1218.76

    20

    -60

    281.00

    AR275

    463823.28

    4366491.45

    1335.70

    280

    -70

    197.00

    AR276

    464097.30

    4366536.06

    1353.62

    335

    -75

    231.80

    AR277

    464333.49

    4366699.46

    1338.05

    215

    -70

    297.40

    AR278

    463445.69

    4366796.77

    1224.87

    40

    -70

    242.60

    AR279

    463515.04

    4366800.22

    1213.77

    90

    -65

    290.00

    AR280

    463820.53

    4366489.45

    1336.81

    280

    -70

    308.00

    AR281

    463685.86

    4366664.45

    1249.93

    10

    -70

    277.00

    AR282

    464223.50

    4366589.41

    1355.55

    190

    -70

    256.90

    AR283

    463291.66

    4366800.91

    1267.49

    40

    -70

    295.80

    AR284

    463685.64

    4366664.00

    1249.89

    225

    -60

    310.60

    AR285

    463292.71

    4366799.34

    1267.50

    220

    -70

    273.10

    AR286

    463460.80

    4366670.72

    1246.17

    40

    -80

    316.00

    AR287

    463622.40

    4367095.16

    1184.28

    305

    -60

    293.00

    AR288

    463388.32

    4366948.65

    1226.27

    220

    -65

    240.60

    AR289

    463800.23

    4366598.95

    1288.76

    235

    -65

    267.30

    AR290

    463647.15

    4367098.35

    1186.03

    340

    -75

    253.00

    AR291

    463573.31

    4366480.82

    1259.91

    65

    -60

    161.10

    AR292

    463447.22

    4366796.91

    1224.54

    220

    -60

    290.00

    AR293

    463258.96

    4366951.05

    1243.52

    220

    -70

    238.00

    AR294

    463562.25

    4366636.13

    1229.65

    240

    -70

    223.00

    AR295

    463185.23

    4367016.68

    1238.85

    225

    -60

    242.10

    AR296

    463622.84

    4367058.52

    1188.46

    250

    -70

    230.00

    AR297

    463665.25

    4367074.83

    1189.40

    100

    -80

    273.00

    AR298

    463329.27

    4366953.22

    1236.88

    350

    -75

    225.50

    AR299

    463624.90

    4367094.24

    1184.86

    255

    -70

    172.10

    AR300

    463624.79

    4367055.94

    1188.69

    190

    -70

    197.00

    AR301

    463181.82

    4366943.97

    1252.94

    30

    -80

    245.10

    AR302

    463715.67

    4366537.79

    1289.54

    180

    -70

    196.30

    AR303

    463642.19

    4367116.42

    1184.33

    50

    -75

    262.50

    AR304

    463496.78

    4366935.74

    1199.88

    75

    -60

    241.70

    AR305

    463023.76

    4367143.55

    1244.75

    350

    -75

    102.10

    AR306

    463663.11

    4367074.90

    1189.65

    185

    -80

    218.00

    AR307

    463687.97

    4366665.72

    1249.43

    130

    -70

    170.00

    AR308

    463625.30

    4367054.73

    1189.28

    330

    -85

    170.00

    AR309

    463025.59

    4367144.14

    1244.51

    220

    -70

    158.50

    AR310

    463641.55

    4367114.43

    1184.82

    5

    -70

    228.20

    AR311

    463664.26

    4367077.32

    1190.05

    250

    -85

    182.50

    AR312

    463182.69

    4366943.96

    1252.94

    220

    -60

    200.20

    AR313

    463616.04

    4366730.08

    1219.23

    150

    -70

    197.20

    AR314

    462954.36

    4367135.42

    1263.37

    220

    -75

    201.85

    AR315

    463620.96

    4367093.78

    1184.27

    280

    -50

    167.00

    AR316

    463331.53

    4366953.90

    1236.88

    220

    -70

    272.50

    AR317

    463436.17

    4366861.97

    1222.32

    200

    -70

    228.00

    AR318

    463737.45

    4367091.84

    1195.37

    40

    -70

    194.90

    AR319

    463693.31

    4366668.34

    1249.77

    130

    -70

    238.00

    AR320

    463646.55

    4367098.16

    1185.84

    280

    -80

    194.00

    AR321

    463108.81

    4366933.33

    1273.18

    220

    -70

    158.40

    AR322

    463103.33

    4367007.25

    1256.40

    5

    -60

    224.00

    AR323

    463824.90

    4367069.07

    1204.88

    40

    -70

    268.00

    AR324

    463647.64

    4367099.12

    1185.45

    130

    -85

    200.00

    AR325

    463735.51

    4367091.10

    1194.87

    350

    -70

    305.50

    AR326

    462955.23

    4367133.90

    1263.06

    45

    -70

    178.70

    AR327

    463515.73

    4366746.00

    1222.67

    80

    -60

    210.60

    AR328

    463713.62

    4367081.43

    1194.05

    310

    -80

    227.00

    AR329

    463823.40

    4367066.33

    1204.09

    90

    -70

    250.70

    AR330

    462949.82

    4367248.29

    1257.22

    240

    -80

    190.60

    AR331

    463736.03

    4367090.22

    1195.97

    5

    -80

    286.50

    AR332

    463105.29

    4367005.24

    1255.99

    220

    -70

    201.30

    AR333

    463783.68

    4367096.92

    1197.76

    40

    -70

    261.00

    AR334

    463559.18

    4366638.68

    1229.51

    20

    -70

    242.50

    AR335

    462950.13

    4367250.26

    1256.94

    90

    -60

    126.80

    AR336

    463661.38

    4367116.51

    1185.35

    80

    -80

    264.00

    AR337

    462960.01

    4367063.49

    1274.43

    220

    -70

    159.20

    AR338

    463375.58

    4366725.22

    1252.79

    220

    -70

    149.30

    AR339

    463710.80

    4367080.36

    1194.49

    180

    -80

    231.80

    AR340

    462899.11

    4366994.79

    1308.61

    220

    -70

    266.20

    AR341

    463367.56

    4366855.89

    1241.97

    180

    -70

    259.30

    AR342

    463790.57

    4367072.82

    1201.90

    345

    -80

    254.50

    AR343

    463747.30

    4367073.89

    1198.08

    340

    -85

    278.10

    AR344

    463691.37

    4366431.51

    1296.58

    40

    -70

    251.50

    AR345

    463661.58

    4367116.18

    1186.11

    240

    -85

    295.40

    AR346

    463197.36

    4366881.76

    1268.49

    220

    -70

    155.90

    AR347

    463490.11

    4366541.31

    1266.40

    220

    -70

    196.80

    AR348

    463766.85

    4367087.58

    1198.38

    190

    -85

    272.00

    AR349

    463627.01

    4366349.51

    1289.14

    290

    -70

    222.50

    AR350

    462881.41

    4367130.15

    1283.27

    290

    -65

    287.80

    AR351

    463259.92

    4366949.82

    1243.28

    40

    -60

    215.00

    AR352

    463260.20

    4366879.79

    1260.48

    220

    -70

    199.80

    AR353

    463489.10

    4366539.47

    1266.38

    40

    -70

    221.20

    AR354

    463573.69

    4366478.90

    1259.60

    75

    -60

    263.20

    AR355

    463693.89

    4366434.29

    1296.54

    150

    -65

    224.50

    AR356

    463367.11

    4366853.94

    1241.32

    70

    -60

    248.30

    AR357

    463714.22

    4366535.47

    1289.60

    335

    -75

    269.80

    AR358

    462882.40

    4367131.92

    1283.26

    50

    -60

    191.00

    AR359

    463337.79

    4366629.85

    1284.59

    220

    -70

    150.20

    AR360

    463575.42

    4366478.09

    1259.64

    220

    -70

    216.20

    AR361

    463712.92

    4366541.59

    1289.45

    80

    -70

    217.50

    AR362

    463692.95

    4366429.31

    1297.05

    260

    -60

    250.00

    AR363

    462877.76

    4367059.48

    1298.55

    220

    -70

    117.90

    AR364

    463573.37

    4366476.38

    1260.18

    300

    -70

    285.50

    AR365

    463633.02

    4366566.70

    1254.53

    120

    -80

    269.40

    AR366

    463438.55

    4366861.17

    1221.71

    45

    -60

    215.00

    AR367

    463050.63

    4366858.41

    1306.46

    220

    -70

    165.70

    AR368

    463688.46

    4366667.12

    1249.68

    50

    -75

    211.00

    AR369

    463613.17

    4366727.68

    1219.80

    0

    -90

    226.00

    AR370

    463559.44

    4366637.09

    1229.10

    340

    -70

    257.00

    AR371

    463464.23

    4366670.12

    1245.60

    220

    -70

    165.90

    AR372

    463802.42

    4366600.56

    1288.53

    150

    -65

    200.00

    AR373

    463475.44

    4366900.83

    1208.42

    10

    -60

    179.10

    AR374

    463425.59

    4367071.99

    1191.84

    120

    -60

    135.30

    AR375

    463515.38

    4366744.71

    1222.59

    80

    -70

    258.00

    AR376

    463464.76

    4367035.75

    1192.94

    270

    -70

    160.50

    AR377

    463059.09

    4367183.10

    1234.18

    60

    -60

    153.90

    AR378

    463515.85

    4366740.27

    1222.72

    350

    -80

    214.10

    AR379

    463387.94

    4367033.75

    1208.42

    210

    -60

    254.10

    AR380

    463058.23

    4367184.86

    1234.09

    300

    -60

    80.00

    AR381

    463129.78

    4367122.28

    1227.74

    250

    -60

    155.00

    AR382

    463203.00

    4367269.70

    1206.93

    265

    -70

    125.00

    AR383

    463203.50

    4367270.41

    1207.73

    20

    -70

    146.00

    AR384

    463164.29

    4367146.56

    1222.54

    270

    -60

    87.50

    AR385

    463099.97

    4367076.71

    1240.21

    70

    -60

    167.00

    AR386

    463236.19

    4367263.14

    1214.13

    180

    -85

    150.50

    AR387

    463495.31

    4366937.30

    1200.42

    260

    -80

    192.70

    AR388

    463281.12

    4367015.70

    1223.16

    210

    -70

    215.50

    AR389

    463059.16

    4367402.06

    1230.39

    280

    -70

    121.60

    AR390

    463476.83

    4366903.50

    1208.50

    100

    -70

    239.90

    AR391

    463060.18

    4367400.22

    1231.00

    190

    -80

    151.50

    AR392

    463209.59

    4367051.58

    1228.69

    230

    -70

    181.10

    AR393

    463520.63

    4367376.54

    1141.74

    0

    -90

    266.20

    AR394

    463057.68

    4367349.73

    1232.21

    0

    -90

    167.00

    AR395

    463017.15

    4367077.88

    1257.19

    25

    -70

    211.00

    AR396

    463063.31

    4367301.12

    1229.75

    0

    -90

    140.20

    AR397

    462960.39

    4367063.44

    1274.97

    70

    -70

    194.00

    AR398

    463821.85

    4366491.83

    1336.60

    330

    -80

    265.00

    AR399

    463024.52

    4367295.97

    1238.52

    310

    -75

    185.00

    AR400

    463598.20

    4367381.35

    1167.08

    240

    -80

    308.50

    AR401

    463016.33

    4367076.96

    1257.04

    220

    -60

    210.40

    AR402

    463920.36

    4366523.37

    1354.03

    220

    -70

    285.00

    AR403

    463025.05

    4367295.58

    1238.39

    0

    -90

    116.10

    AR404

    463184.56

    4367377.39

    1178.41

    80

    -70

    114.40

    AR405

    462954.71

    4366982.16

    1297.52

    0

    -90

    185.00

    AR406

    463039.07

    4367439.69

    1233.17

    350

    -60

    181.00

    AR407

    463564.23

    4367304.45

    1165.80

    40

    -80

    251.30

    AR408

    463531.66

    4366317.63

    1317.65

    220

    -80

    173.00

    AR409

    462979.47

    4367428.47

    1249.02

    330

    -70

    105.90

    AR410

    462973.76

    4366930.66

    1308.10

    220

    -70

    200.20

    AR411

    463857.11

    4366664.09

    1296.29

    90

    -70

    173.60

    AR412

    462932.30

    4367390.23

    1257.65

    270

    -70

    150.70

    AR413

    463579.85

    4366190.58

    1340.56

    40

    -70

    221.50

    AR414

    463634.74

    4367320.76

    1189.86

    220

    -60

    179.00

    AR415

    462951.83

    4366983.21

    1296.95

    220

    -60

    186.50

    AR416

    463805.89

    4366602.01

    1288.95

    180

    -80

    213.40

    AR417

    462918.86

    4367309.39

    1264.13

    60

    -70

    125.00

    AR418

    462878.43

    4367256.78

    1272.69

    270

    -70

    107.20

    AR419

    462877.44

    4367061.48

    1298.37

    60

    -60

    213.50

    AR420

    463637.08

    4367326.82

    1189.65

    60

    -70

    335.90

    AR421

    463713.36

    4366531.88

    1289.72

    195

    -70

    200.80

    AR422

    463579.83

    4366304.01

    1309.46

    220

    -80

    152.60

    AR423

    462837.15

    4367215.93

    1285.88

    270

    -60

    173.50

    AR424

    463330.23

    4366954.13

    1236.54

    80

    -70

    182.50

    AR425

    463256.26

    4366449.09

    1370.52

    40

    -60

    161.80

    AR426

    462835.26

    4367216.31

    1285.72

    60

    -70

    54.40

    AR427

    463506.23

    4366269.01

    1342.45

    220

    -80

    155.50

    Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/ssr-mining-announces-positive-exploration-results-for-the-cakmaktepe-extension-project-ardich-including-40-7-meters-at-7-48-gt-au-301357835.html

    SOURCE SSR Mining Inc.

    Analysen zu SSR Mining Inc Registered Shsmehr Analysen

    Eintrag hinzufügen
    Hinweis: Sie möchten dieses Wertpapier günstig handeln? Sparen Sie sich unnötige Gebühren! Bei finanzen.net Brokerage handeln Sie Ihre Wertpapiere für nur 5 Euro Orderprovision* pro Trade? Hier informieren!
    Es ist ein Fehler aufgetreten!

    Aktien in diesem Artikel

    SSR Mining Inc Registered Shs 5,71 0,67% SSR Mining Inc Registered Shs